Skip to Main Content
Design Ideas Portal
ADD A NEW IDEA

All ideas

Showing 121 of 121

Manhole Schedule Degree Reference

We’ve noticed a significant increase in the use of precast manholes across nearly every development we’re involved in. The companies supplying these typically issue drawings where each incoming pipe is referenced by its angle relative to the outgo...
Guest 10 days ago in Flow 0 📋Registered

Customise the section box appearance for long sections

Being able to adjust the depth of the rows in the section box will speed up the process of producing the long section drawing. Alterations to the table are typically also required in order to be able to read all the information. Setting the text m...
Guest 11 days ago in SmartTools 0 📋Registered

Highlight if the Colebrook-White or the Manning's equations is being used by highlighting (or greying out) the "ks (mm)" or "n" in the link details.

It seems that if a pipe has a swale upstream then the pipe uses the Manning's equations to compute flows etc, but if it has nothing upstream or a pipe upsteam then it uses the Colebrook-White equations. This means that on the same storm water syst...
James Berry about 1 month ago in Flow 0 📋Registered

Cumulative area discounts flow through structures and network before

The cumulative area calculation discounts everything before a flow through structure and the nodes attached to the structure. LLFA's are now requesting calc files due to the print out also reading your incorrect pathing of calculations. Theirs no ...
Guest about 2 months ago in Flow 0 👷🏽‍♀️Promoted

Embodied Carbon Calculation

Embedded carbon calculation per M of PIpe and surround and carbon report output
Guest 10 months ago in Flow 1 👷🏽‍♀️Promoted

To be able to show pipe crossings when plotting long sections.

When plotting long sections, it would be useful to be able to show the crossings from other drainage networks. The crossing are shown on the long sections viewer in flow but not when you plot them.
Guest 8 months ago in Flow 0 👷🏽‍♀️Promoted

Ability to toggle give way triangle on and off

When creating junction road markings using the "Give way junction" option, it would be useful to be able to toggle the give way triangle on and off as it is not always required.
Guest 24 days ago in LiveDesign 0

Add Loading classification to Manhole schedule

Add a column for manhole cover loading classification on manhole schedule. Required for S104 and construction plans
Guest about 2 months ago in Flow 0 👷🏽‍♀️Promoted

Depth to Soffit on Manhole Types

Within Flow, I believe that we have found something where a feature could be slightly amended to aid some standard design processes. Currently, within “MH types”, there is a section where standard/minimum manhole diameters can be set by depth. We ...
Guest 27 days ago in Flow 0 📋Registered

Minimum Pipe Length

The mimimum pipe length in Flow is currently set to 1m. Where modelling junctions and connections there may be less than 1m between the junctions. Please revise the minimum length to around 300-500mm.
Ian George almost 2 years ago in Flow 1 👷🏽‍♀️Promoted