Skip to Main Content
Design Ideas Portal
ADD A NEW IDEA

Flow

Showing 86 of 125

BIM Collaboration

Improved modelling, including building drainage so designs can be modelled to base of internal stacks within buildings to allow for greater collaboration between other design disciplines for general clash detection. Typically, Architects, Structur...
Guest about 1 month ago in Flow 0 📋Registered

Embodied Carbon Calculation

Embedded carbon calculation per M of PIpe and surround and carbon report output
Guest 12 months ago in Flow 1 👷🏽‍♀️Promoted

Provide technical guidance an the use of ReFH2 in Flow

There is an absence of guidance on the use of ReFH2 data in Flow. I understand from discussions with the Help Desk that they don't have access to the software. In the absence of reasonable guidance the ReFH2 features are worthless.
karl Pitman 22 days ago in Flow 0 📋Registered

Chainage, pipe bedding and cover grade information in long section exports

Add chainage, pipe bedding and node cover grade information as options for long section outputs. These are standard requirements for a lot of water authorities so would prevent manual changes being required to allow these outputs to be included.
Guest 26 days ago in Flow 0 📋Registered

To be able to show pipe crossings when plotting long sections.

When plotting long sections, it would be useful to be able to show the crossings from other drainage networks. The crossing are shown on the long sections viewer in flow but not when you plot them.
Guest 10 months ago in Flow 0 👷🏽‍♀️Promoted

Add Loading classification to Manhole schedule

Add a column for manhole cover loading classification on manhole schedule. Required for S104 and construction plans
Guest 3 months ago in Flow 0 👷🏽‍♀️Promoted

Cumulative area discounts flow through structures and network before

The cumulative area calculation discounts everything before a flow through structure and the nodes attached to the structure. LLFA's are now requesting calc files due to the print out also reading your incorrect pathing of calculations. Theirs no ...
Guest 3 months ago in Flow 0 👷🏽‍♀️Promoted

Time to half empty Calculations

I have a request regards time to half empty of infiltration systems. Irrespective of what I set in the preference page (whether time to half empty by volume or by storm) I just get time to half empty of the structure. That isn’t very useful inform...
Steve Doughty 11 months ago in Flow 0 👷🏽‍♀️Promoted

Total Impermeable Area on Calcs Printout

The sum of the total impermeable area is not currently printed on the calcs, this could be incorporated with the total Time/Area information (as per a previous suggestion) as MicroDrainage does.
Ian George about 2 years ago in Flow 0 👷🏽‍♀️Promoted

Minimum Pipe Length

The mimimum pipe length in Flow is currently set to 1m. Where modelling junctions and connections there may be less than 1m between the junctions. Please revise the minimum length to around 300-500mm.
Ian George about 2 years ago in Flow 1 👷🏽‍♀️Promoted