Automatic updates to long sections when changing results

When viewing long sections in conjunction with tabulated results, the sections do not update automatically when the storm event is changed - you have to click the row in the table once more to update the section. Please could this be fully automated?
Guest about 1 month ago in Flow 0 📋Registered

Time Area Diagram in m2 for Green Roof Runoff Method

Change the units for the area column in the time area diagram to m2 (or have the ability for user to change the units between m2 and ha). When using time area diagram, as per the Green Roof Runoff Method (link below), it results in areas of 0.001 ...
Ryan Saunders 9 months ago in Flow 0 📋Registered

To be able to show pipe crossings when plotting long sections.

When plotting long sections, it would be useful to be able to show the crossings from other drainage networks. The crossing are shown on the long sections viewer in flow but not when you plot them.
Guest over 1 year ago in Flow 0 👷🏽‍♀️Promoted

When changing gradients on pipe, automatically changing the downstream pipe to level soffit rather than having to change invert level manually.

No description provided
Tom Fox over 2 years ago in Flow 0 👷🏽‍♀️Promoted

Include check dam option in swales

Check dams are commonly used in swales to temporarily pond runoff to increase pollutant retention and infiltration and decrease flow velocity, but Flow does not have an option to model them. As they are a recognised SuDS feature, and commonly used...
David Collins almost 3 years ago in Flow 2 👷🏽‍♀️Promoted

Manhole label to include a editable description

It would be useful to be able to add a description to manhole labels to provide descriptions such as 'existing manhole to be retained', 'recessed cover', etc.
Cham Ariyaratne 2 months ago in LiveDesign 0

Time to half empty Calculations

I have a request regards time to half empty of infiltration systems. Irrespective of what I set in the preference page (whether time to half empty by volume or by storm) I just get time to half empty of the structure. That isn’t very useful inform...
Steve Doughty over 1 year ago in Flow 0 👷🏽‍♀️Promoted

Urban Creep

Global urban creep isn’t helpful. We have a process of assessing UC on a pipe-by-pipe basis. We separate the areas that UC should be applied to and areas such as flats the highway that don’t need it. If global UC is applied, then you are adding 10...
Ben Stoodley almost 2 years ago in Flow 1 👷🏽‍♀️Promoted

Manhole orientation to match architecture

It would be really useful to be able to align rectangular manholes to match the architectural constraints of a building such as a orientation of a corridor/wall. Currently LiveDesign can only show manholes with the orientation centred and perpendi...
Cham Ariyaratne 2 months ago in LiveDesign 0

Pipe Selection/visibility in output

There is often need to hide certain pipes from the final output. Either they are dummy pipes that have no relation to the final layout or they are areas outside the specific design network that do not need to be included in the report. Microdraina...
Guest almost 2 years ago in Flow 0 👷🏽‍♀️Promoted