Flow through structure Mass balance Issue

Always having mass balance issues when utilising flow through structure. It could be something from adding orifice to inlets same size as pipe, lifting/dropping structure slightly increasing/decreasing length of structure, that sorts the issue. Th...
Guest 9 days ago in Flow 0 📋Registered

Change Porosity display

In the new update when you add the porosity it displays that porosity but it is quite an eye sore and would be beneficial to be able to remove or tone it down a bit.
Guest 14 days ago in Flow 0 📋Registered

Embodied Carbon Calculation

Embedded carbon calculation per M of PIpe and surround and carbon report output
Guest 12 months ago in Flow 1 👷🏽‍♀️Promoted

BIM Collaboration

Improved modelling, including building drainage so designs can be modelled to base of internal stacks within buildings to allow for greater collaboration between other design disciplines for general clash detection. Typically, Architects, Structur...
Guest about 2 months ago in Flow 0 📋Registered

Drive - When creating vehicles enable wheels on separate axles to be adjusted

At present you cannot have varying wheel sizes on each axle and instead can only have one fixed wheel size and width. This therefore means we cannot have accurate swept paths tracks for for vehicles and/or trailers where the wheels sizes change. A...
Guest 27 days ago in LiveDesign 0

To be able to show pipe crossings when plotting long sections.

When plotting long sections, it would be useful to be able to show the crossings from other drainage networks. The crossing are shown on the long sections viewer in flow but not when you plot them.
Guest 10 months ago in Flow 0 👷🏽‍♀️Promoted

Add Loading classification to Manhole schedule

Add a column for manhole cover loading classification on manhole schedule. Required for S104 and construction plans
Guest 3 months ago in Flow 0 👷🏽‍♀️Promoted

Time to half empty Calculations

I have a request regards time to half empty of infiltration systems. Irrespective of what I set in the preference page (whether time to half empty by volume or by storm) I just get time to half empty of the structure. That isn’t very useful inform...
Steve Doughty 11 months ago in Flow 0 👷🏽‍♀️Promoted

Total Impermeable Area on Calcs Printout

The sum of the total impermeable area is not currently printed on the calcs, this could be incorporated with the total Time/Area information (as per a previous suggestion) as MicroDrainage does.
Ian George about 2 years ago in Flow 0 👷🏽‍♀️Promoted

Minimum Pipe Length

The mimimum pipe length in Flow is currently set to 1m. Where modelling junctions and connections there may be less than 1m between the junctions. Please revise the minimum length to around 300-500mm.
Ian George about 2 years ago in Flow 1 👷🏽‍♀️Promoted