An ability to control how many/the length of the manhole schedule to allow it to be fitted to a drawing sheet at usable scale without needing to 'cut' a schedule into multiple sections adjacent to one another and copy the title block along on each.
If there was an option on the Smarttools Smart drainage report for a maximum number of lines prior to starting a new section and the gap between sections it would be useful.