Skip to Main Content
Design Ideas Portal
ADD A NEW IDEA

All ideas

Showing 77

200yr Pre Greenfield Runoff

Looking for the ability to use the system to calculate the 200yr pre development greenfield discharge for a development site. Currently you can only calculate the 1,2,5,10,25,30,50,100,500
Guest over 1 year ago in Flow 0 👷🏽‍♀️Promoted

Drawing outputs such as long sections and manhole schedules to indicate manhole & pipe reference prefixes and suffixes the same way as it appears on the plan

For example if I set "F" prefix for the foul chambers in "Annotations", the manholes on the layout will appear as intended (F1, F2, etc...). However these prefixes are ignored when generating other drawing outputs such as schedules or long section...
Guest 9 months ago in SmartTools 0 👷🏽‍♀️Promoted

Ability to add design parameters

It would be helpful to have following parameters, including the ability to define them globally as well as locally (for node or links) Maximum gradient Minimum Gradient Maximum drop Allow Drop (locally) Maximum cover
Guest 10 months ago in Flow 0 👷🏽‍♀️Promoted

Ability to define design parameters used in network design

Ability to define design parameters used in network design, a bit more granularity than enforce best practice yes/no.
Tom Fox almost 2 years ago in Flow 0 👷🏽‍♀️Promoted

Indicators on manholes with user defined backdrops

Ability to indicate manholes where the designer will allow a user specifiable backdrop would be useful.
Tom Fox almost 2 years ago in Flow 0 👷🏽‍♀️Promoted

Ability to add flow rate check point

Specify check points in a model where discharges rates and peak flow results can be generated, the results should have the ability to be added to the design report. Could this include a graph of the flows at this check point too?
Tom Fox almost 2 years ago in Flow 0 👷🏽‍♀️Promoted

Allow some way to offset and rotate storage structures

This will be very useful for visual clash checking in the 3D viewer. It will also be very beneficial in Live Design and SmartTools
Tom Fox almost 2 years ago in Flow 0 👷🏽‍♀️Promoted

Ability to incorporate the output hydrographs and graphs in the design report.

No description provided
Tom Fox almost 2 years ago in Flow 0 👷🏽‍♀️Promoted

Ability to specify links less than 1m

If links are short Flow flags it up, but just round up to 1m without users having to re-specify This can better integrate with SmartTools.
Tom Fox almost 2 years ago in Flow 0 👷🏽‍♀️Promoted

Ability to adjust output Greenfield runoff rates, volume, and storage estimates calculations separately.

No description provided
Tom Fox almost 2 years ago in Flow 0 👷🏽‍♀️Promoted