Skip to Main Content
Design Ideas Portal
Log in / Sign up
Please enter your email address
Home
PDSF-I-22
PDSF-I-22
Add a new idea
Subscribe
1
VOTE
Status
👷🏽♀️Promoted
Show all details
Product
Flow
Created by
Levente Incze
Created on
Nov 16, 2023
RELATED IDEAS
Ability to hide junctions/RWPs/etc. from the model output manhole schedule. Same with links.
Minimum Pipe Length
select hydrobrakes manually and/or change the flush-flow point
To be able to show pipe crossings when plotting long sections.
Calculate time to half drain for link type structures
Depth to Soffit on Manhole Types
Pipe Selection/visibility in output
Ability to renumber and reorder design locked nodes and pipes.
Foul network analysis
Ability to model saddle connections.
Adding blind connections without the use of a junction chamber splitting the main run to shorter pipes
No description provided
Comments
0
Votes
1
Add a comment
Attach files
Enter a subject
Drop here to upload