Skip to Main Content
Design Ideas Portal
ADD A NEW IDEA

All ideas

Showing 149 of 149

Auto pipe sizing per number of dwellings contributing

We need to upsize wastewater pipes from 150mm dia. to 225mm dia. as soon as the total number of dwellings contributing to that pipe exceeds 20. Could this be added to the Auto-design parameters?
Ian Reilly over 2 years ago in Flow 0 👷🏽‍♀️Promoted

Drawing outputs such as long sections and manhole schedules to indicate manhole & pipe reference prefixes and suffixes the same way as it appears on the plan

For example if I set "F" prefix for the foul chambers in "Annotations", the manholes on the layout will appear as intended (F1, F2, etc...). However these prefixes are ignored when generating other drawing outputs such as schedules or long section...
Guest about 1 year ago in SmartTools 0 👷🏽‍♀️Promoted

Window size when moving Flow between multiple screens

Why does the window size of Flow decrease so much if it is moved from one screen to another when using multiple screens? Somewhat annoying to have to re-size it in the 2nd screen
Ian Woolgar over 2 years ago in Flow 0 👷🏽‍♀️Promoted

pre-development discharge rates/ volumes

When calculating the pre-development discharge rates you get the Qbar and the Qmed for the requested return periods. For discussions with utility providers would be useful to obtain it for storm durations like the 15minutes and 30 minutes storm.
Levente Incze over 2 years ago in Flow 0 👷🏽‍♀️Promoted

Latest Software Download

The latest software download is hidden behind a sales contact form. It would be much easier if the latest software versions were listed with a download link. It could be added to the support section so users would have to login to get the link.
Ian George about 1 year ago in Flow 0 🧑‍🔬Researching

Grouping/filtering CAD layers

Some functionality to group and/or filter the layers in the panel to manage the data a little better. Often, attached drawings from third parties contain unwanted layers.
Henry Kelly over 2 years ago in CausewayCAD 0

Adjusting ground levels on a finished surface

It would be good to adjust the finished surface once roads/plots/drainage have been designed. This would allow 'open space' areas to be created by levelling off parts of a site. Or to create bunds/banks as part of landscaping.
Jason Bale over 2 years ago in LiveDesign 0 Planned

Ability to add design parameters

It would be helpful to have following parameters, including the ability to define them globally as well as locally (for node or links) Maximum gradient Minimum Gradient Maximum drop Allow Drop (locally) Maximum cover
Guest over 1 year ago in Flow 0 👷🏽‍♀️Promoted

Cache input hydrographs, unless parameters changed

It takes a long time for Causeway to open and run RefH2. When designing a network with input hydrographs, it becomes a slow process to re-run the model when making changes to the drainage infrastructure. It would make sense to save the generated i...
Henry Kelly over 1 year ago in Flow 0 👷🏽‍♀️Promoted

Specific Statement of Storage in tank or pond

I don't believe it is possible to simply display the storage amount in printed results (Design Report) as a separate entity. It does of course show up within the results list for the various storms, however, this is not very clear and of course is...
Guest over 1 year ago in Flow 0 👷🏽‍♀️Promoted