It's possible to set the level of the road construction to determine the amount of cut/fill required. Having the same functionality for drainage would be very useful (ideally picking up the design and levels from Flow). Variables which would be needed would be pipe bedding (size and materials), pipe backfill to underside of road construction (width and material), backfill around chambers and the like.